Informa Connect has appointed Global Experience Specialists (GES) as the official Shell Scheme contractor.
Terms & Conditions - *Please read before proceeding
- GES is fully responsible for the installation and supervision of all shell scheme stands.
- GES will also provide full on-site management and technical services.
- Informa shall not be liable to exhibitors/ sponsors for any loss or damage incurred in connection with the provision of services related to the exhibition.
- This includes services such as utilities, AV, stand-building, shell scheme, graphics, freight shipment, logistics, transportation, and delivery services supplied by third-party contractors or venue owners/operators.
- Exhibitors/sponsors acknowledge that services provided by Informa's official, or recommended contractors are subject to separate agreements between each exhibitor/sponsor and the relevant contractor(s).
- Informa recommends that exhibitors/sponsors conduct their own independent due diligence before entering into any such agreements.
Shell Scheme Stand and what's included
Start-up Pod and what's included
(Please note that the visual of the shell scheme above is for illustration purposes only and the stand you may have ordered might be built differently i.e., 3 open sides, a bigger stand with more panels (1m = 1 panel).
Graphics dimensions for Shell Scheme & Start-up Stands:
For seamless graphics: depending on your stand size and open sides, graphics dimensions can be calculated. Dimensions will be Xm Width x 2.5m Height.
For infill graphics: each panel measures 96.6cm Width x 240cm Height (this is excluding the aluminum framework).
Graphics can be ordered through GES or can be sourced through your own supplier.
Damages
Exhibitors are liable for any damage caused to buildings, floors, walls or the shell scheme panels. Damaged shell scheme e.g. wall panels will be charged for at the full replacement value, not the hire value. Exhibitors must not apply paint, lacquer, adhesives or coating to building columns, floors or panels. No bills, signs, floor coverings or other articles should be pasted, nailed, taped or otherwise attached to the walls, floors, ceilings, columns, partitions, panels or trim. Panels cannot be painted, however, you can request printed panels at an additional cost. It is not possible to change the nameboard colour or affix your own fascia.
Fascia Name Board
The name board sits at the top of your stand and will carry your Company Name and Stand Number. Please type carefully or write clearly (upper or lower case) as mistakes will be charged for if they need to be corrected.
If Fascia Nameboard Form is not submitted by the deadline date, the company name as per the Exhibitors List provided by the Organiser will be used to print for your name board.
Please complete the Fascia Nameboard Form on or before 30 Seotember 2026 to ensure your name board is correct.
Shell Scheme Stands (Island Sites)
Wall panels are not generally provided for island sites. If wall panels are required, the allowance is 1 panel per 3 m2 at no additional cost. Contact Sales Team to discuss.
Stand Cleaning
Please note, stand cleaning is *NOT INCLUDED* in your Shell Scheme package. GES will clean the stand on completing the build as part of the handover to the client and the venue will do a general clean of the halls pre-open however this only includes the aisles and clearing of rubbish. It is highly encouraged that exhibitors order stand cleaning. If you require cleaning, please order via DWTC Event Plus. Any rubbish that needs to be collected must be put into the aisles.
Storage behind perimeter stands is not permitted, any items (including stand material) found behind stands will be removed during the daily master cleaning.
Walling rule
Long runs of walling along open perimeters of stands are not permitted. Only 50% of any open side is permitted to be a solid wall.
Where long runs of walling are present along open sides they must be relieved by display items and not left in plain colours – if perimeter walling is more than 1m high, it must not occupy more than 50% of any one side. If long runs of walling are essential and over 50% of the length of stand, they must be recessed by 0.5m from the perimeter of the site and will be subject to written approval by the Organisers.
- Fascia Nameboard Form
- On-Stand Activities Form (Shell Scheme)
- GES Expresso Webshop
- Graphics Order Form