English
Mains supply to Space Only stands and build up power is not included and must be ordered prior to the exhibition. Orders will not be processed until payment is received.
For Shell Schemes & Start-up Stands, 500W power supply is included in their package. If stand requires power supply above 500 watts or 24hr continuous power, this can be ordered through GES. Please get in touch with GES for a quote.
For Safety and Liability reasons, the installation of electrical power onto stands may only be undertaken by Global Experience Specialists (GES) who will ensure that all connections are verified as safe below use.
- All electrical equipment must be tested and labeled by a qualified electrician.
- The organisers may inspect and remove defective or uninspected equipment, with costs charged to the exhibitor.
- Mains connections cannot be installed or altered after stand construction begins.
- Stand power operates 30 minutes before and 30 minutes after the exhibition, contact Global Experience Specialists (GES) for power outside these hours (additional charges apply).
- Exhibitors/Contractors must order sufficient power to prevent overloading.
Topic
Links
Event